A trailer manufacturer wants to gain insight into the feasible output of a new assembly line before he starts building. This is a classical example of a production line where the effect of a failure in one of the links of the production process can have tremendous consequences.
Note: This case study is appropriate for a first approach with the software and can perfectly be used during a first exercise session with ED.